Stainless steel pipe insulation installation specification

Stainless steel pipe insulation installation specification

The installation specification of stainless steel insulation pipe mainly includes the following aspects:

 

Preparation:

Check whether the surface of the pipe is flat, clean and free of rust, remove rust and other pollutants to ensure the adhesion and waterproof effect of the insulation pipe material.1

Check whether the certificate of conformity of the stainless steel insulation pipe, test report and other information is complete, and check whether the quality of the outer pipe is qualified.2

Installation steps:

 

Measure the length of the pipe and cut the insulation pipe using a pipe cutter or other appropriate method.

Install auxiliary components such as supports and fixtures, joints and pipe valves.

Slip the cut stainless steel insulation pipe over the pipe and seal and secure it, ensuring that the pipe is completely encased in insulation.

Seal the sealing process, using specialized sealing materials to seal the pipe seal to ensure that the pipe will not leak.

Caution:

 

Inverted installation will cause damage to the insulation material and poor sealing of the pipe.

Prevent excessive pressure. Excessive pressure will lead to deformation or rupture of the pipe.

Keep the installation environment dry in order to ensure the adhesion of the insulation material and the waterproof effect.

Installation spacing should be maintained at appropriate intervals so as to facilitate access and maintenance of the pipes.

Clean the pipe to prevent impurities and contaminants inside the pipe from contaminating the insulation material.

Other installation requirements:

 

For the welding method of steel jacketed pipe insulation, the pipe should be welded in accordance with the procedures of whole material, undercutting, grooving, grouping, welding, and slag clearing.3

For the pressurized pipe, it is necessary to train the installers to be familiar with the essentials of pressurized pipe construction and strictly follow the construction procedures.4

For pipe connection of different materials, such as stainless steel pipe and pipe connection of different materials, it is necessary to take different treatment according to the material of the pipe.

The above is the installation of stainless steel pipe insulation of the basic norms and steps, the specific operation should be carried out according to the actual situation and product instructions.

NEED HELP?

WELCOME TO CONTACT US

As a leading mining machinery manufacturer and exporter in China, we are always here to provide you with high quality products and better services. Welcome to contact us through one of the following ways or visit our company and factories.

Better Service and Better Quality Are Our Main Goal For A Lifetime
Follow Us

Related Products

No information has been published in this category
Scroll to Top

NEED HELP?

WELCOME TO CONTACT US

As a factory of Sunning Steel in China , we are always ready to provide you with better quality and services. Welcome to contact us or visit our company and factory in the following ways

Contact Us